- Philstar.com
- The Philippine Star
- Pilipino Star Ngayon
- The Freeman
- Pang-Masa
- Banat
- Interaksyon
- Coupons
SUPPORT PHILSTAR
About Us |
Contact Us |
Advertise |
Privacy Policy |
Member Agreement |
Copyright Notice
Copyright © 2024. Philstar Global Corp. All Rights Reserved
X
+ Follow TEODORO CRUZ JR. Tag
Array ( [results] => Array ( [0] => Array ( [ArticleID] => 338814 [Title] => Fuentebella poll victory affirmed [Summary] => The House of Representatives Electoral Tribunal (HRET) has upheld the victory in the May 2004 election of Camarines Sur third district Rep. Arnulfo Fuentebella as it dismissed the electoral protest filed by his rival.
In its May 16 ruling, the tribunal junked the protest of Teodoro Cruz Jr., former chairman of the Light Rail Transit Authority, after a recount and revision showed that Fuentebellas margin of 6,789 votes was actually short of 119 votes.
[DatePublished] => 2006-05-27 00:00:00 [ColumnID] => 133272 [Focus] => 0 [AuthorID] => 1096652 [AuthorName] => Delon Porcalla [SectionName] => Nation [SectionUrl] => nation [URL] => ) [1] => Array ( [ArticleID] => 232733 [Title] => LRT: No inspection, no entry [Summary] => The Light Rail Transit Authority (LRTA) reiterated yesterday that it will be strictly enforcing its "no inspection, no entry" policy on all packages of passengers of the LRT Line 1, Line 2 and the Metro Rail Transit particularly on wrapped Christmas gifts.
In a statement released yesterday, the LRTA said that they saw the need for the reiteration of the policy in the face of the increasing number of complaints from passengers of the two rail lines about the inspection of their wrapped Christmas presents.
[DatePublished] => 2003-12-24 00:00:00 [ColumnID] => 133272 [Focus] => 0 [AuthorID] => [AuthorName] => [SectionName] => Metro [SectionUrl] => metro [URL] => ) [2] => Array ( [ArticleID] => 154566 [Title] => LRT, MRT magpapahinga [Summary] => Kasabay ng paggunita ng Mahal na Araw, inihayag ng Light Rail Transit (LRT) at Metro Rail Transit (MRT) na walang operasyon ng apat at tatlong araw ang mga de-kuryenteng tren upang isailalim sa maintenance repair.
Sinabi ni LRTA administrator Teodoro Cruz Jr. na mag-uumpisa ang pagsususpinde ng operasyon mula sa Marso 28-31 at muling magbubukas ng operasyon sa Abril 1 dakong alas-5 ng umaga.
[DatePublished] => 2002-03-20 00:00:00 [ColumnID] => 133272 [Focus] => 0 [AuthorID] => [AuthorName] => [SectionName] => PSN Metro [SectionUrl] => metro [URL] => ) [3] => Array ( [ArticleID] => 148543 [Title] => Power generators itatayo ng LRT at MRT [Summary] => Upang hindi mahinto ang operasyon ng LRT at MRT sa tuwing may power outage ay ipagtatayo ito ng sariling power generators.
Ito ang sinabi ni Dept. of Transportation and Communications (DOTC) Sec. Pantaleon Alvarez kahapon kaugnay ng Luzon-wide power blackout kamakailan na nagpahinto sa mga tren ng MRT at LRT ng ilang oras.
"Pero alam naman natin na ang pagtatayo ng back-up generators para sa MRT at LRT ay medyo matagal-tagal din," ang sabi ni Alvarez.
[DatePublished] => 2002-01-27 00:00:00 [ColumnID] => 133272 [Focus] => 0 [AuthorID] => [AuthorName] => [SectionName] => PSN Metro [SectionUrl] => metro [URL] => ) ) )
TEODORO CRUZ JR.
Array ( [results] => Array ( [0] => Array ( [ArticleID] => 338814 [Title] => Fuentebella poll victory affirmed [Summary] => The House of Representatives Electoral Tribunal (HRET) has upheld the victory in the May 2004 election of Camarines Sur third district Rep. Arnulfo Fuentebella as it dismissed the electoral protest filed by his rival.
In its May 16 ruling, the tribunal junked the protest of Teodoro Cruz Jr., former chairman of the Light Rail Transit Authority, after a recount and revision showed that Fuentebellas margin of 6,789 votes was actually short of 119 votes.
[DatePublished] => 2006-05-27 00:00:00 [ColumnID] => 133272 [Focus] => 0 [AuthorID] => 1096652 [AuthorName] => Delon Porcalla [SectionName] => Nation [SectionUrl] => nation [URL] => ) [1] => Array ( [ArticleID] => 232733 [Title] => LRT: No inspection, no entry [Summary] => The Light Rail Transit Authority (LRTA) reiterated yesterday that it will be strictly enforcing its "no inspection, no entry" policy on all packages of passengers of the LRT Line 1, Line 2 and the Metro Rail Transit particularly on wrapped Christmas gifts.
In a statement released yesterday, the LRTA said that they saw the need for the reiteration of the policy in the face of the increasing number of complaints from passengers of the two rail lines about the inspection of their wrapped Christmas presents.
[DatePublished] => 2003-12-24 00:00:00 [ColumnID] => 133272 [Focus] => 0 [AuthorID] => [AuthorName] => [SectionName] => Metro [SectionUrl] => metro [URL] => ) [2] => Array ( [ArticleID] => 154566 [Title] => LRT, MRT magpapahinga [Summary] => Kasabay ng paggunita ng Mahal na Araw, inihayag ng Light Rail Transit (LRT) at Metro Rail Transit (MRT) na walang operasyon ng apat at tatlong araw ang mga de-kuryenteng tren upang isailalim sa maintenance repair.
Sinabi ni LRTA administrator Teodoro Cruz Jr. na mag-uumpisa ang pagsususpinde ng operasyon mula sa Marso 28-31 at muling magbubukas ng operasyon sa Abril 1 dakong alas-5 ng umaga.
[DatePublished] => 2002-03-20 00:00:00 [ColumnID] => 133272 [Focus] => 0 [AuthorID] => [AuthorName] => [SectionName] => PSN Metro [SectionUrl] => metro [URL] => ) [3] => Array ( [ArticleID] => 148543 [Title] => Power generators itatayo ng LRT at MRT [Summary] => Upang hindi mahinto ang operasyon ng LRT at MRT sa tuwing may power outage ay ipagtatayo ito ng sariling power generators.
Ito ang sinabi ni Dept. of Transportation and Communications (DOTC) Sec. Pantaleon Alvarez kahapon kaugnay ng Luzon-wide power blackout kamakailan na nagpahinto sa mga tren ng MRT at LRT ng ilang oras.
"Pero alam naman natin na ang pagtatayo ng back-up generators para sa MRT at LRT ay medyo matagal-tagal din," ang sabi ni Alvarez.
[DatePublished] => 2002-01-27 00:00:00 [ColumnID] => 133272 [Focus] => 0 [AuthorID] => [AuthorName] => [SectionName] => PSN Metro [SectionUrl] => metro [URL] => ) ) )
abtest
By Delon Porcalla | May 27, 2006 - 12:00am
December 24, 2003 - 12:00am
March 20, 2002 - 12:00am
January 27, 2002 - 12:00am
Recommended
Keanu Jahns carded a sensational seven-under-par 64 to wrest a one-shot lead over Enrico Gallardo in the rain-hit ICTSI Forest Hills Classic at the Nicklaus course here yesterday.
12 hours ago
Keanu Jahns continued his stellar form from his near-miss at Splendido Taal in July, carding a sensational seven-under-par 64 to wrest a slim one-shot lead over a surging Enrico Gallardo in the rain-hit ICTSI Forest Hills Classic.
18 hours ago
Tropical Storm Helen (International name: Pulasan) is set to leave the Philippine area of responsibility (PAR) by Wednesday night, September 18, but it will still enhance the southwest monsoon or habagat, triggering rain and winds across the country.
18 hours ago
Twenty individuals died due to the combined effects of the enhanced southwest monsoon, locally known as habagat, and tropical cyclones "Ferdie" and "Gener."
22 hours ago
While no tropical cyclone wind signal is in effect, both tropical cyclones are still expected to enhance the southwest monsoon, triggering rain across different parts of the country.
1 day ago
Lotto Sep 18, 2024
EZ2/LVM - 27 7
SUERTRES - 0 6 4
4D Lotto - 1 9 2 6
6/45 Mega Lotto - 36 4 29 25 45 28
P55,038,387.00
6/55 Grand Lotto - 2 15 45 31 19 24
P29,700,000.00
Forex
February 12, 2018
- 12:00 am
- 12:00 am
1$ : P51.66