+ Follow POWER FACTOR CAPACITOR BANK Tag
Array
(
[results] => Array
(
[0] => Array
(
[ArticleID] => 309148
[Title] => Maynilad announces water cut-off in Cavite, Metro
[Summary] => Some areas in Bacoor, Imus and Kawit, Cavite, will have no water for 16 hours, starting at 11 p.m. on Nov. 29 and until 3 p.m. on Nov. 30.
The water service interruption is due to the interconnection of the newly constructed crossover pipe to the existing 600mm S.P. mainline at the Zapote Bridge crossing along Zapote Road, Las Piñas-Bacoor Boundary.
[DatePublished] => 2005-11-28 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] =>
[AuthorName] =>
[SectionName] => Metro
[SectionUrl] => metro
[URL] =>
)
)
)
POWER FACTOR CAPACITOR BANK
Array
(
[results] => Array
(
[0] => Array
(
[ArticleID] => 309148
[Title] => Maynilad announces water cut-off in Cavite, Metro
[Summary] => Some areas in Bacoor, Imus and Kawit, Cavite, will have no water for 16 hours, starting at 11 p.m. on Nov. 29 and until 3 p.m. on Nov. 30.
The water service interruption is due to the interconnection of the newly constructed crossover pipe to the existing 600mm S.P. mainline at the Zapote Bridge crossing along Zapote Road, Las Piñas-Bacoor Boundary.
[DatePublished] => 2005-11-28 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] =>
[AuthorName] =>
[SectionName] => Metro
[SectionUrl] => metro
[URL] =>
)
)
)
abtest
November 28, 2005 - 12:00am