+ Follow CEBU CORP Tag
Array
(
[results] => Array
(
[0] => Array
(
[ArticleID] => 744224
[Title] => Korean firm starts free feeding plan
[Summary] => At least 190 children enrolled in Colon Elementary School in the City of Naga were picked as beneficiaries of the daily feeding program initiated by EWP Cebu Corp.
[DatePublished] => 2011-11-04 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] =>
[AuthorName] =>
[SectionName] => Freeman Metro Cebu
[SectionUrl] => metro-cebu
[URL] =>
)
[1] => Array
(
[ArticleID] => 271735
[Title] => Kepco Cebu to build P15-B power plant
[Summary] => KEPCO Cebu Corp. (KECECO), a joint venture of KEPCO Philippines Corp. (60 percent) and Salcon Power Corp. (40 percent), is investing P15 billion to construct a 200-MW coal-fired base load power plant in Naga, Cebu.
The first 100-MW generator will start operations in December 2008, while the second 100 MW generator will be operational in March 2009.
A total annual power production of about 1,185,053 MWH will be generated at P3.920 KWH to be sold directly to the Visayas Electric Cooperative and other nearby local electric cooperatives.
[DatePublished] => 2005-03-28 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] => 1805266
[AuthorName] => Marianne V. Go
[SectionName] => Business
[SectionUrl] => business
[URL] =>
)
)
)
CEBU CORP
Array
(
[results] => Array
(
[0] => Array
(
[ArticleID] => 744224
[Title] => Korean firm starts free feeding plan
[Summary] => At least 190 children enrolled in Colon Elementary School in the City of Naga were picked as beneficiaries of the daily feeding program initiated by EWP Cebu Corp.
[DatePublished] => 2011-11-04 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] =>
[AuthorName] =>
[SectionName] => Freeman Metro Cebu
[SectionUrl] => metro-cebu
[URL] =>
)
[1] => Array
(
[ArticleID] => 271735
[Title] => Kepco Cebu to build P15-B power plant
[Summary] => KEPCO Cebu Corp. (KECECO), a joint venture of KEPCO Philippines Corp. (60 percent) and Salcon Power Corp. (40 percent), is investing P15 billion to construct a 200-MW coal-fired base load power plant in Naga, Cebu.
The first 100-MW generator will start operations in December 2008, while the second 100 MW generator will be operational in March 2009.
A total annual power production of about 1,185,053 MWH will be generated at P3.920 KWH to be sold directly to the Visayas Electric Cooperative and other nearby local electric cooperatives.
[DatePublished] => 2005-03-28 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] => 1805266
[AuthorName] => Marianne V. Go
[SectionName] => Business
[SectionUrl] => business
[URL] =>
)
)
)
abtest
November 4, 2011 - 12:00am