+ Follow bilateral agreements Tag
Array
(
[results] => Array
(
[0] => Array
(
[ArticleID] => 734168
[Title] => Real estate regulation chief now an IRM
[Summary] => The Chairman of the Professional Regulatory Board of Real Estate Service (PRBRES), Hon. Eduardo G. Ong is now an International Realtor Member (IRM).
[DatePublished] => 2011-10-06 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] =>
[AuthorName] =>
[SectionName] => Freeman Cebu Business
[SectionUrl] => cebu-business
[URL] =>
)
[1] => Array
(
[ArticleID] => 271735
[Title] => Kepco Cebu to build P15-B power plant
[Summary] => KEPCO Cebu Corp. (KECECO), a joint venture of KEPCO Philippines Corp. (60 percent) and Salcon Power Corp. (40 percent), is investing P15 billion to construct a 200-MW coal-fired base load power plant in Naga, Cebu.
The first 100-MW generator will start operations in December 2008, while the second 100 MW generator will be operational in March 2009.
A total annual power production of about 1,185,053 MWH will be generated at P3.920 KWH to be sold directly to the Visayas Electric Cooperative and other nearby local electric cooperatives.
[DatePublished] => 2005-03-28 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] => 1805266
[AuthorName] => Marianne V. Go
[SectionName] => Business
[SectionUrl] => business
[URL] =>
)
)
)
bilateral agreements
Array
(
[results] => Array
(
[0] => Array
(
[ArticleID] => 734168
[Title] => Real estate regulation chief now an IRM
[Summary] => The Chairman of the Professional Regulatory Board of Real Estate Service (PRBRES), Hon. Eduardo G. Ong is now an International Realtor Member (IRM).
[DatePublished] => 2011-10-06 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] =>
[AuthorName] =>
[SectionName] => Freeman Cebu Business
[SectionUrl] => cebu-business
[URL] =>
)
[1] => Array
(
[ArticleID] => 271735
[Title] => Kepco Cebu to build P15-B power plant
[Summary] => KEPCO Cebu Corp. (KECECO), a joint venture of KEPCO Philippines Corp. (60 percent) and Salcon Power Corp. (40 percent), is investing P15 billion to construct a 200-MW coal-fired base load power plant in Naga, Cebu.
The first 100-MW generator will start operations in December 2008, while the second 100 MW generator will be operational in March 2009.
A total annual power production of about 1,185,053 MWH will be generated at P3.920 KWH to be sold directly to the Visayas Electric Cooperative and other nearby local electric cooperatives.
[DatePublished] => 2005-03-28 00:00:00
[ColumnID] => 133272
[Focus] => 0
[AuthorID] => 1805266
[AuthorName] => Marianne V. Go
[SectionName] => Business
[SectionUrl] => business
[URL] =>
)
)
)
abtest
October 6, 2011 - 12:00am