- Philstar.com
- The Philippine Star
- Pilipino Star Ngayon
- The Freeman
- Pang-Masa
- Banat
- Interaksyon
- Coupons
Array ( [results] => Array ( [0] => Array ( [ArticleID] => 100340 [Title] => IMPSA completes tests for Kalayaan power turbines [Summary] =>IMPSA's research and development hydraulic laboratory in Argentina has completed testing the scale model for the turbines to be installed in the Kalayaan power plant in the Philippines, and the company has begun the fabrication of key components such as the runners.
Following these optimization tests the Kalayaan's turbines will perform a maximum output of 178 MW, a maximum-guarantee-pumping efficiency of 92.66 percent and an average-weighted-generation efficiency of 91.5 percent, al [DatePublished] => 2000-03-29 00:00:00 [ColumnID] => 133272 [Focus] => 0 [AuthorID] => [AuthorName] => [SectionName] => Business [SectionUrl] => business [URL] => ) ) )
BERNARDO BELING
Array ( [results] => Array ( [0] => Array ( [ArticleID] => 100340 [Title] => IMPSA completes tests for Kalayaan power turbines [Summary] =>IMPSA's research and development hydraulic laboratory in Argentina has completed testing the scale model for the turbines to be installed in the Kalayaan power plant in the Philippines, and the company has begun the fabrication of key components such as the runners.
Following these optimization tests the Kalayaan's turbines will perform a maximum output of 178 MW, a maximum-guarantee-pumping efficiency of 92.66 percent and an average-weighted-generation efficiency of 91.5 percent, al [DatePublished] => 2000-03-29 00:00:00 [ColumnID] => 133272 [Focus] => 0 [AuthorID] => [AuthorName] => [SectionName] => Business [SectionUrl] => business [URL] => ) ) )
abtest
EZ2 - 28 2
SUERTRES - 6 1 9
6/49 Lotto - 16 22 13 28 9 27
P15,840,000.00
6/58 Ultra Lotto - 31 56 15 51 30 14
P150,367,501.00
- 12:00 am