^

Nation

Longer blackouts to hit CDO, Misamis

The Philippine Star

CAGAYAN DE ORO CITY, Philippines – Consumers being serviced by the Cagayan Electric Power and Light Co. (Cepalco) will experience longer blackouts following the load curtailment imposed by the National Power Corp. (Napocor).

Jaime Rafael Paguio, Cepalco senior vice president, said  Napocor has imposed an 18-megawatt load curtailment pending approval of its provisional authority for the purchase of an additional 10 MW from a new modular diesel power plant operated by Mindanao Energy Systems Inc.

Cepalco has a peak demand of 150 to 170 MW within its franchise area in Cagayan de Oro and the towns of Tagoloan, Villanueva and Jasaan in Misamis Oriental.

Meanwhile, a 10-hour blackout will hit Santiago City and Ramon town in Isabela tomorrow, the National Grid Corp. of the Philippines (NGCP) announced yesterday.

The NGCP said the power interruption is part of the annual preventive maintenance and testing of a power transformer at the Santiago City sub-station, which covers the distribution facilities of Isabela Electric Cooperative 1.

The blackout is from 8 a.m. to 5 p.m. – Gerry Lee Gorit, Raymund Catindig

CAGAYAN ELECTRIC POWER AND LIGHT CO

CEPALCO

GERRY LEE GORIT

ISABELA ELECTRIC COOPERATIVE

JAIME RAFAEL PAGUIO

MINDANAO ENERGY SYSTEMS INC

MISAMIS ORIENTAL

NAPOCOR

NATIONAL GRID CORP

NATIONAL POWER CORP

RAYMUND CATINDIG

Philstar
  • Latest
  • Trending
Latest
Latest
abtest
Are you sure you want to log out?
X
Login

Philstar.com is one of the most vibrant, opinionated, discerning communities of readers on cyberspace. With your meaningful insights, help shape the stories that can shape the country. Sign up now!

Get Updated:

Signup for the News Round now

FORGOT PASSWORD?
SIGN IN
or sign in with