^

Cebu News

CEDC'S COAL-FIRED POWER PLANT: GMA switches on 82MW more for Cebu

- Mitchelle L. Palaubsanon -

CEBU, Philippines - “The additional power is much needed especially Cebu have been experiencing rotating brownouts.”

So said President Gloria Macapagal-Arroyo, who led the switch on ceremony yesterday of the first of three units of the 246 MW coal-fired power plant of the Cebu Energy Development Corporation in Toledo City.

The switch-on ceremony signaled the full operation of the 82 MW first unit coming at a time when Cebu and other provinces in the region are experiencing rotating brownouts.

The switching on of the said plant is a breakthrough not only for CEDC but also for the Province of Cebu.

CEDC’s $450-million or roughly P3 billion coal-fired power plant is a joint venture of Global Business Power Corp., the power arm of the Metrobank Group, Formosa Heavy Industries Corp, Aboitiz Power Corp and Vivant Power Corp.

Units 2 and 3 are expected to go on line by the end of May and the end of December, respectively.

Arroyo said that since this power plant uses clean coal technology, we can assure that our air has less carbon emissions as compared to the old technology. — /NLQ(FREEMAN NEWS)

 

ABOITIZ POWER CORP AND VIVANT POWER CORP

CEBU

CEBU ENERGY DEVELOPMENT CORPORATION

CORP

FORMOSA HEAVY INDUSTRIES CORP

GLOBAL BUSINESS POWER CORP

METROBANK GROUP

POWER

PRESIDENT GLORIA MACAPAGAL-ARROYO

PROVINCE OF CEBU

TOLEDO CITY

  • Latest
  • Trending
Latest
Latest
abtest
Are you sure you want to log out?
X
Login

Philstar.com is one of the most vibrant, opinionated, discerning communities of readers on cyberspace. With your meaningful insights, help shape the stories that can shape the country. Sign up now!

Get Updated:

Signup for the News Round now

FORGOT PASSWORD?
SIGN IN
or sign in with