Megaworldís Eastwood Excelsior Set for Q2 Delivery

Premier residential developer Megaworld Corporation is readying the twin-tower Eastwood Excelsior for full delivery by the second quarter of 2005. One of Megaworldís fastest-selling projects in Eastwood City, Eastwood Excelsior is now 96.3 percent complete. Already in place are an elegant porte-cochËre with a paved driveway, classical-style fountain and main entry canopy. Meanwhile, all exterior works including window installation and painting are substantially complete, with interior finishing, wall partitioning and electro-mechanical equipment installation in progress at both towers. Interior works for the grand lobby at the ground level are complete. Fusing old European and contemporary themes, Eastwood Excelsior hosts executive studios to three-bedroom condominium homes. Among its deluxe amenities are lap and wading pools with a sun deck, changing rooms, a fitness center, multilevel parking, laundromat and retail arcade adjoining the lobby.

For more information, pls. contact: Megaworld Corporate Communications Department

Tel.:
867-8826 to 40 loc. 280, 8678807

Fax:
867-8903

Email:
advtg@megaworldcorp.com

Show comments